[FPSPACE] Dawn Journal for December 30, 2009

LARRY KLAES ljk4 at msn.com
Mon Jan 4 19:41:59 EST 2010


Dawn Journal
 
December 30, 2009

 
Dear Dawnters and Sons,
 
The Dawn mission continues to go smoothly, as Earth’s distant envoy carries out its interplanetary journey. Although the craft still devotes most of its time to the slow but efficient reshaping of its orbit around the Sun to match Vesta’s, controllers gave it some extra assignments since the last log to ensure its systems remain healthy and to prepare for its studies of Vesta. 
 
Dawn usually interrupts ion thrusting once a week for about 8 hours to point its main antenna to Earth. On November 30, however, instead of resuming thrusting, it dutifully followed different instructions that were stored onboard. 
 
The spacecraft began the 5 days of special activities by activating the gamma ray and neutron detector (GRaND). Despite its name, GRaND is not at all pretentious, but its capabilities are quite impressive. It will reveal the atomic constituents of the surfaces of Vesta and Ceres. GRaND’s measurements of space radiation this month showed it to be in excellent health. After a week of smooth operation, it was deactivated on December 7.
 
The visible and infrared mapping spectrometer (VIR) and the primary science camera also were turned on for the first time in more than half a year. As these sensors yield complementary data, controllers want to refine earlier measurements of exactly how their views overlap. This will allow scientists to correlate observations from the instruments in order to glean as much as possible about the nature of the protoplanets the craft will orbit. Dawn rotated to point at a star and then observed it simultaneously with VIR and the camera. By measuring precisely where the star registers in each device, their relative alignments can be pinned down. Upon completing the sequence of commands to acquire the desired data, the spacecraft turned to point its main antenna to Earth again and began transmitting the results during the next scheduled session with the Deep Space Network a few hours later.
 
The VIR team quickly discovered that a subtle incompatibility between certain instructions in the program for recording the signals from the star caused its shutter to remain closed. (VIR also has a reusable protective cover, but that operated as intended.) The unit continued to function and stayed healthy, but it did not perform the planned observations. The science camera imaged the target, but the purpose was to compare where the star appeared in the 2 instruments. The VIR commands are easily corrected, and the calibration will be executed again early next year.
 
Earlier this year, engineers developed new software for the science camera to improve its efficiency in mapping the distant worlds Vesta and Ceres. The software was updated once before in space, and the process followed this week was the same. As last year, loading software into the primary and the backup cameras was performed as entirely separate activities; each camera was off while the other was being upgraded. This was the only major work this week that was not accomplished with commands that had previously been stored on the spacecraft. After the new software was installed, each camera was directed to carry out a set of tests, and the results confirmed that both were operating correctly.

 

Full journal entry here:

 

http://dawn.jpl.nasa.gov/mission/journal_12_30_09.asp

 

 
 		 	   		  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://www.friends-partners.org/pipermail/fpspace/attachments/20100104/ca7b8bd6/attachment.html 


More information about the FPSPACE mailing list