This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com

astronautix.com Scout X-3

Scout X3
Scout X3 - Scout X3 - COSPAR 1964-015

8,646 bytes. 101 x 412 pixels.



Family: Scout. Country: USA. Status: Hardware.

Specifications

Launches: 10. Failures: 3. Success Rate: 70.00% pct. First Launch Date: 31 August 1962. Last Launch Date: 09 October 1964. LEO Payload: 87 kg. to: 185 km Orbit. Liftoff Thrust: 52,350 kgf. Total Mass: 17,350 kg. Core Diameter: 1.0 m. Total Length: 24.0 m. Flyaway Unit Cost $: 8.91 million. in 1985 unit dollars.


Scout X-3 Chronology


1962 Aug 31 - LV Configuration: Scout X-3A. Launch Site: Wallops Island . FAILURE: Failure.
1962 Dec 16 - - 14:33 GMT. LV Configuration: Scout X-3 s/n S115. Launch Site: Wallops Island . Launch Complex: LA3.
1962 Dec 19 - - 01:25 GMT. LV Configuration: Scout X-3 s/n S118. Launch Site: Vandenberg . Launch Complex: LC-D.
1963 Feb 19 - - 16:33 GMT. LV Configuration: Scout X-3M s/n S126. Launch Site: Vandenberg . Launch Complex: LC-D.
1963 Apr 5 - - 03:01 GMT. LV Configuration: Scout X-3 s/n S119. Launch Site: Vandenberg . Launch Complex: LC-D. FAILURE: Failure.
1963 May 22 - Launch Site: Wallops Island .
1963 Jun 16 - - 01:49 GMT. LV Configuration: Scout X-3 s/n S120. Launch Site: Vandenberg . Launch Complex: LC-D.
1963 Jul 20 - LV Configuration: Scout X-3M. Launch Site: Wallops Island . FAILURE: Failure.
1964 Mar 27 - - 17:25 GMT. LV Configuration: Scout X-3 s/n S127R. Launch Site: Wallops Island . Launch Complex: LA3.
1964 Oct 9 - LV Configuration: Scout X-3C. Launch Site: Wallops Island .

Bibliography:



Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .