This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com

astronautix.com Delta 5920

Delta 5920
Delta 5920 - Delta 5920-8 no. 189 - COSPAR 1989-089

14,952 bytes. 185 x 464 pixels.



Family: Delta. Country: USA. Status: Hardware.

Specifications

Launches: 1. Failures: 0. Success Rate: 100.00% pct. First Launch Date: 18 November 1989. Last Launch Date: 18 November 1989. LEO Payload: 3,848 kg. to: 185 km Orbit. Payload: 1,405 kg. to a: Geosynchronous transfer trajectory. Liftoff Thrust: 353,730 kgf. Total Mass: 201,580 kg. Core Diameter: 2.4 m. Total Length: 34.0 m. Flyaway Unit Cost $: 34.22 million. in 1985 unit dollars.


Delta 5920 Chronology


1989 Nov 18 - - 14:38 GMT. LV Configuration: Delta 5920-8 / Delta s/n 189. Launch Site: Vandenberg . Launch Complex: SLC2W.

Bibliography:



Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .