This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com

astronautix.com OS-1962

L1 Complex 1961
L1 Complex 1961 - The earliest Sever project tackled such problems as manoeuvring in orbit, rendezvous and docking, use of manipulators to move station modules, and testing of lifting re-entry vehicles. Sever was 50% larger than Soyuz, which replaced it by late 1961 in OKB-1 studies.

7,438 bytes. 433 x 130 pixels.



Class: Manned. Type: Space Station. Nation: USSR. Manufacturer: OKB-1.

On 10 March 1962 Korolev approved the technical project "Complex docking of spacecraft in earth orbit - Soyuz". This contained the original Soyuz L1 circumlunar design. The Vostok-Zh could be used on another mission to assemble a 15 tonne orbital station with the mission of observing the earth. It would consist of three separately-launched blocks: a ZhO living section, BAA scientific apparatus block, and the Soyuz spacecraft itself. This closely resembled Sever, another contemporary study project at OKB-1.


Specification

Total Mass: 13,500 kg.


OS-1962 Chronology


10 March 1962 Soyuz Technical Project approved.

Korolev approved the technical project 'Complex docking of spacecraft in earth orbit - Soyuz'. The Soyuz would first be tested using multiple launches of an R-7 derived rocket. In this concept a large spacecraft was assembled in earth orbit by a Vostok-Zh (or Vostok-7) manoeuvrable manned satellite, piloted by a 'cosmonaut assemblyman'. Following completion of assembly, the Vostok would return to earth. The assembled circumlunar craft would put the L1, with a crew of one to three, on a circumlunar trajectory. The Vostok-Zh could be used on another mission to assemble a 15 tonne OS orbital station with the mission of observing the earth.



Bibliography:



Back to Index
Last update 12 March 2001.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .