This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com

astronautix.com Gemini Pecan


Class: Manned. Type: Space Station. Nation: USA. Agency: NASA.

In 1964 the MSC Advanced Spacecraft Technology Division formulated a mission flight plan for using a Gemini spacecraft to link up with an orbiting vehicle to achieve a long-duration space mission (dubbed the "Pecan" mission). The two crewmen were to transfer to the Pecan for the duration of the mission.


Specification


Gemini Pecan Chronology


29 April 1964 Gemini Pecan Mission.

C. Howard Robins, Jr., and others in the MSC Advanced Spacecraft Technology Division investigated the suitability of and formulated a tentative mission flight plan for using a Gemini spacecraft to link up with an orbiting vehicle to achieve a long-duration space mission (dubbed the 'Pecan' mission). The two crewmen were to transfer to the Pecan for the duration of the mission. As with similar investigations for the application of Apollo hardware, the scheme postulated by Robins and his colleagues emphasized maximum use of existing and planned hardware, facilities, and operational techniques.



Back to Index
Last update 12 March 2001.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .