This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com

astronautix.com Apollo Experiments Pallet

Apollo Pallet
Apollo Pallet

Credit: NASA. 8,712 bytes. 442 x 413 pixels.


Class: Manned. Type: Lunar orbiter. Nation: USA.

The Apollo Experiments Pallet was a sophisticated instrument payload that would have been installed in the Apollo CSM for dedicated lunar or earth orbital resource assessment missions. Study contracts were let to Lockheed, Martin, McDonnell, and Northrop, but with cutbacks to Apollo the concept never proceeded to the hardware stage.


Specification


Apollo Experiments Pallet Chronology


06 December 1965 Apollo Experiments Pallet Phase I Program: Apollo.

George E. Mueller, NASA Associate Administrator for Manned Space Flight, notified MSC Director Robert R. Gilruth that NASA Administrator James E. Webb and Associate Administrator Robert C. Seamans, Jr., had selected Lockheed Aircraft Corporation, The Martin Company, McDonnell Aircraft Corporation, and Northrop Corporation for Phase I of the Apollo Experiments Pallet Procurement. The contracts would be for four months and each would be valued at about $375,000.


22 August 1966 Apollo experiment pallet cancelled Program: Apollo.

NASA informed four firms that had completed design studies on the Apollo experiment pallet that there would be no hardware development and fabrication of the pallet. The four firms had been selected in November 1965 to make four-month studies of a pallet to carry experiments in the spacecraft SM during the Apollo manned lunar landings. The firms were Lockheed Missiles and Space Co., Sunnyvale, Calif.; The Martin Co., Denver, Colo.; McDonnell Aircraft Corp., St. Louis, Mo.; and Northrop Space Laboratories, Hawthorne, Calif.



Bibliography:



Back to Index
Last update 12 March 2001.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .