This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com
 |
Saturn A-1 - Credit: © Mark Wade. 3,033 bytes. 76 x 719 pixels. |
|
Family: Saturn C. Country: USA. Status: Study 1959.
Projected first version of Saturn I, to be used if necessary before S-IV liquid hydrogen second stage became available. Titan 1 first stage used as second stage, Centaur third stage. Masses, payload estimated.
SpecificationsLEO Payload: 6,500 kg. to: 185 km Orbit. at: 28.0 degrees. Liftoff Thrust: 682,200 kgf. Total Mass: 532,280 kg. Core Diameter: 6.5 m. Total Length: 60.0 m. Flyaway Unit Cost $: 73.80 million. in 1985 unit dollars.
- Stage Number: 1. 1 x Saturn I Gross Mass: 432,681 kg. Empty Mass: 45,267 kg. Thrust (vac): 773,160 kgf. Isp: 289 sec. Burn time: 150 sec. Isp(sl): 255 sec. Diameter: 6.5 m. Span: 6.5 m. Length: 24.5 m. Propellants: Lox/Kerosene No Engines: 8. H-1
- Stage Number: 2. 1 x Titan 1-1 Gross Mass: 76,203 kg. Empty Mass: 4,000 kg. Thrust (vac): 149,685 kgf. Isp: 290 sec. Burn time: 138 sec. Isp(sl): 256 sec. Diameter: 3.1 m. Span: 3.1 m. Length: 16.0 m. Propellants: Lox/Kerosene No Engines: 2. LR-87-3
- Stage Number: 3. 1 x Centaur C Gross Mass: 15,600 kg. Empty Mass: 1,996 kg. Thrust (vac): 13,608 kgf. Isp: 425 sec. Burn time: 430 sec. Isp(sl): 0 sec. Diameter: 3.1 m. Span: 3.1 m. Length: 9.1 m. Propellants: Lox/LH2 No Engines: 2. RL-10A-1
Saturn A-1 Chronology
1959 Apr 15 -
- Use of Titan for Saturn upper stages
In response to a request by the DOD-NASA) Saturn Ad Hoc Committee, the Army Ordnance Missile Command (AOMC) sent a supplement to the "Saturn System Study" to the Advanced Research Projects Agency ARPA describing the use of Titan for Saturn upper stages.
Additional Details: Use of Titan for Saturn upper stages.
Bibliography:- 45 - Koelle, Heinz Hermann,, Handbook of Astronautical Engineering, McGraw-Hill,New York, 1961.
- 222 - Bilstein, Roger E, Stages to Saturn, US Government Printing Office, 1980.
- 228 - Lowther, Scott, Saturn: Development, Details, Derivatives and Descendants, Work in progress. Availabe chapters may be ordered directly from Scott Lowther at web site indicated. HTML when accessed: http://www.webcreations.com/ptm
Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .